Harris Welding Expansion
-
Date Completed:June 6, 2025
-
Category:
-
Location:Ashland, OH
Harris Welding Expansion Project
Pre-Engineered Metal Buildings for Manufacturing Growth
Harris Welding & Machine Co. is no stranger to growth. Six years ago, Simonson Construction completed their paint booth and restroom addition. Fast forward to today, and we were honored to partner again, this time on a 15,000+ square-foot expansion to meet their increasing production demands.
Project Overview
To support Harris Welding’s growing fabrication needs, our team designed and built:
-
10,000 SF Fabrication Facility – Expanding manufacturing capacity and storage capabilities.
-
1,600 SF Employee Breakroom – Providing an inviting, functional space for their team.
-
Large Connector Building – Seamlessly linking the new facility with existing operations.
These pre-engineered metal buildings were chosen for their strength, speed of construction, and cost efficiency, giving Harris Welding the space they need, on schedule and built to last.
Self-Performed Construction Work at Harris Welding Expansion
This project showcases multiple trades that are self-performed. Self-performed work provides ensuring quality, safety, and efficiency:
-
Pre-Engineered Metal Building Erection
-
Metal Roofing & Siding
-
Doors, Hardware, & Accessories
Why Choose Pre-Engineered Metal Buildings?
For manufacturers like Harris Welding, pre-engineered metal buildings provide:
-
Faster Construction Timelines – Get into your new space sooner.
-
Lower Maintenance Costs – Durable materials built for decades of performance.
-
Custom Design Options – Tailored to match your workflow and growth.
A Partnership Built on Trust
We’re extremely grateful to have earned Harris Welding’s trust for multiple projects. Every expansion is a sign of their success and a testament to what’s possible when a design-build contractor works hand-in-hand with a client’s goals.
Ready to grow? Connect with us!